Turnout bearers

Production plants for turnout bearers.

Machinery and plant solutions for the bearers used in railway switches and turnouts.

Your turnout bearer production plant

Built around your railway project.

PLAN supplies production plants and machinery for turnout bearers used in railway switches.

Production options include pre-tensioned and post-tensioned systems, with casting and curing in 2-gang or 4-gang moulds. Bearer lengths range from 2.20 to 6.80 metres.

Pre-tensioned systemsPost-tensioned systems2-gang and 4-gang moulds
Turnout bearers manufactured using PLAN production equipment

Plant configuration

See how the stages connect.

An illustrative PLAN turnout bearer plant layout, showing the numbered production stations.

PLAN turnout bearer production plant layout with numbered workstationsView the plant layout →

Production stages

Follow the process.

Explore the production equipment, from reinforcement preparation to finishing.

Reinforcement preparation equipment for turnout bearer production
1 / PRODUCTION STAGE

Reinforcement preparation

Bottom shutter replacement equipment for turnout bearer production
2 / PRODUCTION STAGE

Bottom shutter replacement

Mould release agent applicator equipment for turnout bearer production
3 / PRODUCTION STAGE

Mould release agent applicator

Stressing (Post-tensioned system) equipment for turnout bearer production
4 / PRODUCTION STAGE

Stressing (Post-tensioned system)

Stressing (Pre-tensioned system) equipment for turnout bearer production
4.1 / PRODUCTION STAGE

Stressing (Pre-tensioned system)

casting equipment for turnout bearer production
5 / PRODUCTION STAGE

Casting

curing equipment for turnout bearer production
6 / PRODUCTION STAGE

Curing

Pre-demoulding station (release) equipment for turnout bearer production
7 / PRODUCTION STAGE

Pre-demoulding station (release)

Demoulding equipment for turnout bearer production
8 / PRODUCTION STAGE

Demoulding

Demoulding equipment for turnout bearer production
8.1 / PRODUCTION STAGE

Demoulding

Finishing equipment for turnout bearer production
9 / PRODUCTION STAGE

Finishing

Plan your turnout bearer project

Start with your requirements.

Share your bearer drawings, production targets and railway project requirements with our team.

Discuss your bearer plant →