Carousel Plant for the production of wall panels
The 3D image below shows a carousel plant for the production of wall panels. The daily production goes from 1000 up to 3000 square meters. Each mould takes 10 minutes to complete a cycle with the result of 48-60 worked moulds per shift. The labour incidence is 4-8 min/sqm and the operators needed are from 8 to 15, according to the required daily productivity of the plant.
The working stations pointed out in the image are illustrative of a typical carousel plant for the production of precast panels and therefore are adjustable according to customers’ needs.

PRODUCTS
airport slabs double walls external wall panels face mix wall panels floor panels predalles solid panels